Bait Al Galeed for Air Conditioning completed the HVAC installation for the Warfa Project in Riyadh, Saudi Arabia, using a total cooling capacity of 210 TR – MIDEA / GREE.
The system was designed to deliver efficient cooling performance, stable operation, and long-term reliability.
Our team handled the project with precision and adhered to advanced HVAC engineering standards to ensure optimal comfort and performance.